tenerife galleries wells 25 million investment

Tenerife’s galleries and wells to get €25m investment

Compiled with the help of artificial intelligence, based on Spanish-language information. Source below the article.

Record investment to keep Tenerife’s water flowing

Tenerife’s galleries and wells are to mobilise a record investment of €25 million up to 2028 to maintain their production and reinforce the island’s water supply. The Cabildo is contributing €9 million through two calls of €4.5 million each, while the water communities are taking on another €16 million. The effort is directed at a system that supplies around 70% of the water consumed by Tenerife residents. The investment comes just as the Canary Islands Government announces an amendment to the Water Law to facilitate the continuation of certain exploitation rights that expire in 2040. The reform, incorporated into the draft regional budgets for 2027, will allow applications for new concessions of up to 75 years. Both initiatives respond to concern over the future of facilities that are essential to water supply.

New €4.5 million allocation for 2027-2028

The Cabildo de Tenerife’s budgets for 2027, which have just been presented, include a new allocation of €4.5 million for aid to galleries and wells during the 2027-2028 biennium, as confirmed by Blanca Pérez, the island councillor for the Natural Environment and Sustainability. The amount matches that earmarked for the 2025-2026 call and will fund drilling to search for new water sources, replacement of pipes, installation of pumps and safety improvements. “We already approved a total of €4.5 million in the aid under the 2025-2026 call, and in the budgets we have just drawn up we are repeating an identical allocation for the 2027-2028 call,” explains Pérez. The aim is “to maintain and reinforce the contribution from these water sources”.

Seventy-seven applications in the previous call

The previous call gives an idea of the scale of the works. The Consejo Insular de Aguas de Tenerife received 77 applications, and the resolution of May 2026 listed 68 beneficiary projects. The grants cover between 15% and 50% of the eligible cost, with a maximum of €360,000 per project. The rest is met by the promoters. Among the works put forward, the extension of galleries stands out. The Río de las Siete Fuentes community proposed drilling a further 150 metres in a tunnel whose face is already more than five kilometres from the entrance. At San Juan de Chío, another 150 metres of horizontal advance was planned. And at Vergara II, in the heights above La Guancha, there is a 104-metre drilling project, accompanied by ventilation improvements. These works seek to locate new sources or maintain existing flows, although advancing through the rock is no guarantee of finding more water.

Making the most of existing flows

Other communities are directing their projects towards making better use of the water already extracted. The El Milagro gallery proposed installing 2,400 metres of piping in its interior conduit. The Barranco de Vergara community, which has the greatest flow of any on the island, proposed replacing another pipe with a galvanised steel one. Repairs to channels and conduits to reduce losses during transport of the resource from the extraction points to the distribution points are also contemplated. Worker safety is another priority. The La Fife gallery requested a forced ventilation motor to renew the air inside. Other works envisage reinforcing walls and ceilings, installing ventilation ducts and renewing the tracks used to transport materials. The wells include submersible pumps, level sensors and access equipment.

Tunnels and wells hidden beneath the surface

These works are carried out in facilities that are barely visible from the surface. Galleries are tunnels excavated horizontally into volcanic mountains to intercept rainwater that has seeped in and is stored underground. When they reach a productive zone, the flow usually emerges by gravity and is carried through channels or pipes. Wells are mainly vertical boreholes that reach underground reserves and generally require pumps to raise the water. Both tap into the aquifer, the set of geological formations that store this resource and allow it to circulate. Tenerife has 1,121 galleries and 398 wells on record, although some are inactive or never found water. A total of 589 galleries and 180 wells remain in operation: 769 extraction points that sustain much of the island’s consumption.

Dependence varies across the island

Dependence varies according to the area. Santa Cruz has increased its supply from desalination, while numerous mid-altitude and upland communities remain especially dependent on groundwater. Bringing flows from other sources to them requires transport and pumping infrastructure. Behind these operations are the water communities, private associations of owners who hold shares in galleries and wells. Their members pay for the drilling, the equipment and maintenance, and use or sell the water to which they are entitled for urban supply and irrigation. The Cámara de Aguas estimates that around 20,000 people hold shares in Tenerife.

A system that predates desalination

The system was born long before desalination. With no major permanent rivers and difficulties in storing water on the surface, farmers pooled capital from the 19th century onwards to open tunnels in search of underground reserves. Excavations multiplied during the 20th century, driven by the expansion of banana growing. The cabuqueros drilled through the rock with barreno drills and explosives, exposed to gases and rockfalls. Many galleries failed; others sustained Tenerife’s agricultural and urban growth. Some maintain extraordinary production. Vergara I and II, in La Guancha, together supply around one million litres every hour and rank among the most productive extraction points in the Canary Islands. The Barranco de Vergara community brings together some 600 shareholders, who continue to fund works to preserve their facilities.

The 2040 deadline and legal certainty

The amendment included in the regional budgets would allow holders of temporary uses registered in the Water Register to apply for a new concession without a competitive tender during the year before expiry, provided they meet the legal requirements. The 2040 deadline was a particular concern for communities that must now decide whether to undertake drilling and repairs whose cost will take years to recover. Blanca Pérez links legal certainty to the survival of the most vulnerable operations. “If we did not extend those rights, medium and small galleries and wells were in jeopardy, which put at risk a water supply system more than a century old,” she argues. While the legal change is being processed, the communities face the cost of maintaining tunnels, pumps and conduits in an aquifer whose reserves have been reduced by decades of extraction.

Source

Scroll to Top