Compiled with the help of artificial intelligence, based on Spanish-language information. Source below the article.
Tenerife seals off Los Roques beach for good
The Cabildo de Tenerife has definitively closed access to the iconic Playa de Los Roques, located on the coast of Toscal-Longuera (Los Realejos) and within the Rambla de Castro Protected Landscape and Special Area of Conservation (ZEC). The project for work on the slopes of Ensenada del Burgado has opted to eliminate the footpaths as the best way to stabilise the banks, a course of action also recommended by the geotechnical report. “It is barely viable to make the area safe enough to reopen it,” the technical experts believe.
Playa de Los Roques has been subject to various access restrictions for more than a decade because of the risk of rockfalls and collapses, which has now led to the definitive decision to close it. The island authority has approved the project – now open to public consultation – which combines demolitions, the erasing of footpaths, the removal of deteriorated protective structures, cleaning, control of invasive plants and vegetation recovery. The budget for the work amounts to more than €300,000 and the execution period is eight months.
Path above the beach to be kept for viewing points
However, the path that runs above the beach will be preserved, and the technical recommendation is to dedicate it to visual enjoyment by means of viewing points. Despite the warnings prohibiting access for years, the report notes that at the time of the technical inspection – in 2024 – there were people climbing over the fence to reach the bathing area.
The diagnosis set out in the project report refers to a loss of support and wear to the direct access to the shoreline, to which it adds rocks falling onto the mid-slope route, damage to protective structures and sections in a precarious state of equilibrium. It notes that the banks have suffered episodes of landslides and rockfalls affecting the paths. The geologist Juan Ramón Jiménez López describes “continuous degradation and, in episodes, undermined ground and exposed areas”.
Three footpaths across 27,000 square metres
The intervention area covers approximately 27,000 square metres, taking in three routes or footpaths of just over 700 metres in length in different parts of the slope. The first, the direct access to the beach, is classified as high risk due to undermining and wear. The mid-slope path – the second – measures 420 metres and is affected by falling rocks. The last, referred to in the report as the fishermen’s path, runs close to the left-hand side of the shoreline.
The demolition work on the path will affect 574 square metres and 123 metres of wall. On top of that comes the removal of almost 1,000 square metres of braided steel mesh and 35 metres of fencing. The work will begin with the removal of the concrete slab and continue with the retaining walls, from top to bottom and in small sections. As for the elimination of the footpaths, the plan is to clear obstacles, work the surface of the ground with a milling machine, remove a layer of between 15 and 30 centimetres, redistribute materials and introduce vegetation. The aim is for the route to lose its status as a path and become part of the natural recovery.
What’s happening in the Canaries – straight to your phone
News, weather alerts and practical updates – direct from the islands, in English. We live here and know what’s going on – before the international media catch up. Everything lands on our WhatsApp channel – no middlemen, no algorithm. Curated for families, expats and travelers.









